Monopole Installation

Customer needed a high capacity microwave backhaul solution to securely transmit sensitive banking and financial data to a protected datacenter.

1 Poles Staked, Core sample taken, eng complete
2 Trucks and Materials staged
3 Crane Arrives
4 Pole and Crane Preparing
5 Outriggers set, crane setting up
6 Pole Rigging and Balancing
7 Pole set on the ground to install attachments
8 climbing Pegs installed
9 Crane Walking Pole into Place
10 Pole in Place
11 Start Augering Hole
12  Hole for the pole
13 Pole Dropped into place
14 Done
15 Clean up at Base